Second installation Split Barge and Excavator with Tolk & Dusterhus

Second installation Split Barge and Excavator with Tolk & Dusterhus

**Second GeoDredge System Installation** Installation of a dual GeoDredge system, with one system installed on the split barge and the other integrated into the crane. The split barge system uses draft sensors and Viking TDS to monitor its position and volume and communicate wirelessly with the GeoDredge system on the crane. This creates a live connection between both systems, allowing the operator to see each other’s position in real time, as well as where material has already been dredged or discharged. This provides a clear overview of the entire operation and enables efficient coordination between the crane and split barge.